Client:
Pathways

Start Date:
October 2011

Completed:
April 2012

Value:
£216,000


Pathways

Taylor Court Refurbishment

FWJ were selected by the not-for-profit organisation, Pathways, to carry out refurbishment works at their Taylor Court sheltered housing accommodation located in Ealing, Middlesex. The project was managed by our locally situated unit in Shepperton.

Taylor Court contains seventeen one-bed apartments and one two-bed apartment. FWJ carried out works to twelve of the apartments, which benefitted from window and door replacements, decorations throughout in addition to bathroom and kitchen refurbishments. The majority of bathrooms were converted to wet rooms.

Aiming to minimise inconvenience to residents, FWJ helped residents to pack their belongings and move them into temporary accommodation within Taylor Court. This was used whilst their dwelling was being refurbished. We then helped residents to settle back into their newly refurbished home.